Revisiting a LiDAR survey

LiDAR instrument and reference globes in a bioswale

Ashleigh and I preformed a follow up LiDAR survey at Roychester Park this month. The previous survey was conducted before the stormwater control measures were installed, thanks to former student Liz Cushman and Dr. Jon Nyquist. We performed the follow up survey to compare how the hillslope changed and do runoff modeling and sampling of the stormwater control measure: Chapter 3 of Ashleigh’s Ph.D Thesis!

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply