Frozen stormwater

Postdoc Sarah Beganskas and I went out early in February to install some temperature loggers for citizen science monitoring and ran into a limitation: the stormwater was frozen in the culverts and pipes.  We were also scouting sites to install a new logging flowmeter, but I will avoid these spots even in warm weather because graffiti means too much foot traffic.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply