PennDOT reporting

This has been a busy month for the PennDOT project on the I-95 corridor.  All of the co-PIs are writing progress reports about our monitoring of plants, stormflow, and baseline water levels and water chemistry.  Postdoc Rob Rossi and I resurveyed the wells near the stormwater basin to double check their elevations before uploading a data for PennDOT.  The Philadelphia Water Dept has also requested our data for use in a city wide groundwater model.

 

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply