Valley Green Inn Environmental Restoration Program

Description

The Valley Green Environmental Restoration Program was created by the Friends of the Wissahickon to rehabilitate the Valley Green Inn and improve the environmental condition of the land surrounding the Inn. Flooding had taken its toll along this portion of the Wissahickon Creek, and the corridor’s stone walls were battered from the water loads. To prevent future flood damage from occurring, rain gardens and riparian restoration techniques were designed by Andropogon Associates to capture stormwater in order to mitigate water volume. These BMPs enhance streamside habitat conditions and water quality by filtering pollutants from runoff; the riparian buffer also prevents streambank erosion.

Photo Credit: Andropogon Associates, Inc.

Rain Garden

These site improvements were implemented along with other safety and access improvements, including increased parking and curbs, better sidewalks, additional points of access, and lighting. This project was begun in May 2006 and was completed in September 2008.

Location

County: Philadelphia
Watershed: Wissahickon Creek

Partners

Andropogon Associates
Fairmount Park Commission
Philadelphia Water Department

Cost

Total cost for all site improvements: $505,000

Contact

Maura McCarthy
Friends of the Wissahickon
8708 Germantown Avenue
Philadelphia, PA 19118
215-247-0417
mccarthy@fow.org