![](https://sites.temple.edu/jacoblader/files/2022/12/thumbnail_IMG_0242-768x1024.jpeg)
(Above) For his Eagle Scout project, my brother Toby Lader led the construction and installation of a metal bike rack and repair station outside the Bethlehem Area Public Library. I used a MIG welder to help assemble the metal stands and attach them to base plates. I also helped install the stands into the existing concrete base.
![](https://sites.temple.edu/jacoblader/files/2022/12/IMG_7723-768x1024.jpg)
(Above) My first MIG project. I cut bars and used an acetylene torch to bend them to shape. Inside the cage is a wooden block covered in paper which cannot be removed.